Skip to content
Modules / Documents

The current revision, in every hand.

NEXUS builds your forms and issues one controlled revision to the floor, the lockout, the inspection and the job, and every citation is a link to the real thing, so no one works from a copy that was superseded last month.

Failure to follow written procedures was the FDA's most-cited drug finding in 2024 · 184 citations, fiscal 2024
See it on your plant drawingA working session on your own plant.
  1. Uploada PDF or a drawing
  2. Approveby the right role
  3. Issueto every place it is used
  4. Findin two words
  5. ReviseB replaces A, everywhere
Why careful plants still get it wrong

The binder is current. The copy on the floor is not.

Most plants control their documents well in the office. The copy at the job was printed in March, the procedure changed in June, and the audit finds the gap in September.

NEXUS issues the controlled revision itself to the places that use it, and every citation is a link: a procedure named in a work pack, an inspection or a corrective action opens the actual document, and a document that points at an inspection or an action opens that record in its module. Forms and templates are built here once and used where the work happens. When revision B is issued, A is gone from every one of those places the same minute.
How it works

From a file to a controlled document, then to the floor.

01

Build or upload

A form or a template built in the builder, or a PDF or a drawing uploaded, becomes a controlled document with its kind, its owner and its number, in one screen.

02

Approve and issue

The right roles approve and issue, with the record of who and when. Nothing is signed by a name; everything is signed by a role.

03

Find, follow, revise

Anyone finds the current revision in two words. Every reference to it, anywhere in NEXUS, is a link that opens it. A revision carries the number of the one it replaces and replaces it everywhere at once.

What each person gets

The crew gets the right one. The manager can prove it.

The crew

The current one, always

The procedure on the tablet is the issued revision. There is no other copy to pick up by mistake.

The document manager

Every revision, provable

Who uploaded, approved and issued, with the time; what it replaced; where it is used. The audit is a search.

The executive

No stale copy in the plant

Documents effective, reviews due and revisions in approval, by site, on the Clarity board.

Proof

Numbers we can stand behind.

184

Failure to follow written procedures (21 CFR 211.22(d)) was the FDA's most-cited drug manufacturing finding in fiscal 2024, with 184 citations; procedures missing altogether was third.FDA inspection citations, fiscal 2024, as presented by the agency

Every count NEXUS shows you is measured on your own records: documents effective, reviews due, revisions in approval, copies replaced. We do not quote averages from someone else's pilot.

Connected

One record, eight modules.

Lockout/Tagout

The plan from the controlled drawing

Never a stale copy.

Work Control

The pack carries the procedure

The issued revision, in the job.

Asset Management

Drawings on the asset

Every asset knows its documents.

Clarity

Currency

Reviews due and revisions in approval, by site.

Starting

A walkthrough on your own procedure.

Bring one procedure and one form you fill in by hand today. In a working session NEXUS takes the procedure in and you build the form, you approve and issue both, and you watch the form appear in the module that needs it and the citation become a link. No slides, no migration, nothing to install.

What you need

One procedure, one form. One hour.

A PDF, the paper form, and the person who approves procedures. Works the same with the intelligence switched off.

See it on your plant drawing.

The current revision, in every hand.

Request a walkthrough