Skip to content
Modules / Lockout/Tagout

Isolate the right energy source, every shift.

NEXUS builds each lockout from your plant drawing, so crews work from the picture the plant was built on, not a binder.

Lockout/Tagout was OSHA's fourth most-cited standard in 2025 · 2,562 violations
See it on your plant drawingA working session on your own plant.
  1. Planfrom the drawing
  2. Approveby a second person
  3. Placelocks and tags
  4. Verifyin the field
  5. Releaseand restore
Why careful plants still get it wrong

The drawing is in a cabinet. The lock is on the valve.

Nothing connects them. The permit is written from memory, the procedure was superseded last month, and the one person who knows the line is on the other shift. The gap is found at the worst time.

NEXUS reads the drawing, proposes the isolation points, and keeps the plan, the locks and the proof on one record with the work order. The crew sees the same picture the engineer sees.
How it works

Five steps. One record.

01

Plan from the drawing

NEXUS reads the process drawing and proposes the isolation points, with its reasoning shown. The planner adjusts and saves.

02

A second person approves

Someone who did not write the plan checks it against the drawing. One screen, one decision.

03

Place, in order

Locks and tags go on in the plan's order, from a phone, each one recorded as it is placed.

04

Verify in the field

A second person confirms zero energy at each point. The release waits until every point is verified.

05

Release and restore

Isolations come off in order, restoration is confirmed, and the whole record stays with the job.

What each person gets

The crew works faster. The manager can prove it.

The crew

The drawing in your hand

No binder, no guesswork. The plan on the phone, the points in order, a green check when each one is done.

The EHS and maintenance manager

Every lockout, provable

Who planned it, who approved it, who placed and verified each lock, with the time. The audit is a search, not a week.

The executive

Risk you can see

Open isolations, overdue releases and unverified points on one live scorecard in Clarity, by site, as they happen.

Proof

Numbers we can stand behind.

4th

Lockout/Tagout (29 CFR 1910.147) was the fourth most-cited OSHA standard in fiscal 2025, with 2,562 violations.Safety+Health Magazine, OSHA's FY2025 top ten, 2025

Every count NEXUS shows you is measured on your own plant, from your own records. We do not quote averages from someone else's pilot.

Connected

One record, eight modules.

Work Control

The lockout waits for the work order

A job cannot be released against an isolation that is not in force.

Documents

The current drawing, always

The plan is built from the controlled revision, never a stale copy.

Asset Management

Every point is an asset

Valves, breakers and switches carry their isolation history.

Clarity

The heartbeat

Lockouts in force, overdue and unverified, live, by site.

Starting

A walkthrough on your own drawing.

Bring one drawing and one isolation that lives on it. In a working session, NEXUS reads it in front of you, proposes the points, and you walk the five steps. No slides, no data migration, nothing to install.

What you need

One drawing. One hour.

A PDF of a process drawing and the person who signs your permits. Works the same with the intelligence switched off, because a safety system that depends on a cloud service is not a safety system.

See it on your plant drawing.

Isolate the right energy source, every shift.

Request a walkthrough